Access the Full Project by Clicking here!
Bidjugde
JOB
Miramar Landfill Storm Water Improvements
BID DATE
11/15/17 - 2:00
AGENCY
San Diego
ESTIMATE
$3,260,000
SCOPE
The Project object is to reduce sediment and other pollutants in storm water discharges at the West Miramar Waste Disposal Facility (Facility), including stabilizing sections of the Main Haul Road and road shoulders with asphalt concrete pavement or aggregate, reducing erosive storm water runoff and sediment mobilization through construction or implementation of stabilized roadside ditches, tracking controls, stabilized low flow road crossings, gabion check dam structures, slope interruption devices, soil berms, and drainage inlet and outlet protection, and stabilizing disturbed soil areas through soil preparation and application of hydro-seed and hydraulic mulch. Hydroseeding work shall be timed to occur between October 1 and December 15th. Contractor’s Health and Safety Plan shall include working around hazards that are inherent to an active landfill site. Antoinette Sanfilippo - 619-533-3439 asanfilippo@sandiego.gov
UPDATES