Access the Full Project by Clicking here!
Bidjugde
JOB
Torrey Pines Road Improvements Phase 2 Torrey Pines Slope Restoration
BID DATE
10/26/17 - 2:00
AGENCY
San Diego
ESTIMATE
$2,930,000
SCOPE
1. SCOPE OF WORK: The contract scope of work includes the following: 1.1. Torrey Pines Road Improvements Phase 2 scope of work includes the following: 1) Installation of new sidewalk, retaining curb, and walls on the south side of Torrey Pines Road between Hillside Drive and Amalfi Street. 2) Installation of a pedestrian crossing on Torrey Pines Road just west of Princess Drive utilizing a HAWK (Hybrid Actuated Walk Beacon) with street lighting and crosswalk systems. 3) Asphalt concrete overlay with striping of buffered bike lanes along Torrey Pines Road from La Jolla Shores Drive to Princess Drive. 4) Installation of a flush stamped and painted asphalt median between Roseland Drive and Hillside Drive. 1.1.1. The Work shall be performed in accordance with: 1.1.1.1. The Notice Inviting Bids and Plans numbered 39770-01-D through 39770-19-D, inclusive. 1.2. Torrey Pines Road Slope Restoration scope of work will include an excavation at the toe of the slope to achieve the required space for the sidewalk, removal of sloughing soil and debris off of slope face, and installation of permanent soil-nails wall with an outer boulderscape or rock carve surface. The soil-nails, up to 40 feet in length, will be installed into the slope at an angle of approximately 15 degrees below horizontal. Horizontal and vertical spacing of the soil-nail will be approximately 6 feet. Roughly 265 soil-nails will be installed to construct the permanent wall. Brittany Friedenreich /619-533-3104 bfriedenreic@sandiego.gov
PREBID
10/10/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT