Access the Full Project by Clicking here!
Bidjugde
JOB
French Valley RW Pipeline Phase 1
BID DATE
10/19/17 - 10:00
AGENCY
Eastern Municipal WD
ESTIMATE
$945,000
SCOPE
The work to be constructed is located in Riverside County on Benton Road, from 600± feet west of Pourroy Road to Cady Road, and Pourroy Road, from Benton Road to approximately 1,050 feet northerly (see Thomas Guide 39th Edition, Page 929, Grid E1). All work shall be performed within the limits of the existing public right-of-way, as depicted on the Construction Drawings. The work consists of approximately 3,100 LF of 12 PVC recycled waterlines and associated appurtenances (valves, blowoffs, and air valves). Quantities are approximate. Bidders are responsible to verify actual quantities from the detailed design drawings to accurately calculate quantity take-offs. balvanef@emwd.org & wimberlv@emwd.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT