Access the Full Project by Clicking here!
Bidjugde
JOB
Fourth St Infrastructure Improvement
BID DATE
02/5/18 - 2:00
AGENCY
Hollister
ESTIMATE
n/a
SCOPE
The work to be performed includes, but is not necessarily limited to: the installation of a new 12 waterline and new 36 storm drain line on Fourth Street, a new 24 storm drain line on College Street, and a new 24 storm drain line on Powell Street. in accordance with the plans and specifications. The new line will be tied to existing lines in Fourth, Line, Mapleton and College Streets, and the existing 8 line will be capped and abandoned in place. Two new fire hydrants will be installed, and all water services and meter boxes along the new water line will be replaced. New curb, gutter, driveways and ramps will be installed on Fourth Street, with an add/alternate for new sidewalk. New curb ramps and curb inlets will be installed as indicated at the intersection of Fifth and College streets, and Powell and Sixth St. Danny Hillstock City of Hollister Engineering Department 375 Fifth Street Hollister, CA 95023 Tel:(831) 636-4340 x15 Fax:(831) 634-4913 danny.hillstock@hollister.ca.gov
UPDATES