Access the Full Project by Clicking here!
Bidjugde
JOB
Monrovia Renewal South Area Infrastructure Improvements
BID DATE
10/4/17 - 2:00
AGENCY
Monrovia
ESTIMATE
$5,714,848
SCOPE
The Project Includes: Demolition of: asphalt pavement, pulverization of pavement, saw cut concrete and asphalt, including the removal of: concrete curb and gutter, sidewalk, driveways, cross gutter, curb ramps, cold mill of AC pavement, and AC pavement. Construction of: AC pavement, concrete: curb and gutter, sidewalk, drive approaches, curb ramps, cross gutters, longitudinal gutters, transitional curbs, parkway drains, cape seal, slurry seal, adjust utilities, adjust manholes, storm water catch basins, local depressions, 8 & 12 storm water pipe, pipe to catch basin connection, manhole pipe to pipe, grated catch basins, drywells - single and double chambered, traffic control, SWPPP, erosion control, and public notification. This project also includes: removing and replacing asphalt pavement, sewer bypass and dewatering/pumping, grinding asphalt paving, removing, and installation of: 1, 1½, 2, Water Services, and abandoning existing water services. The project also includes: pre and post CCTV, inspection of sewer pipe lines, removing and replacing sewer line sections and wyes, installation of lateral connections, lateral reinstatement, CIPP lining of sewer lines, CIPP point and/or sectional repair of sewer lines, reconnect of sewer service laterals internally, manhole base repair/replacement.
PREBID
9/21/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT