Access the Full Project by Clicking here!
Bidjugde
JOB
(CMAR) White Tanks FRS No. 4 Rehabilitation Project Phase 2
BID DATE
06/4/13 - 2:00
AGENCY
MCFCD
ESTIMATE
$19,000,000
SCOPE
UPDATE: AWARDED TO SUNDT /RUMMEL JOINT VENTURE ON 6/4/13. UPDATE: 4/8/13 - FIRM HAS BEEN SELECTED AND WILL NOT BE RELEASED UNTIL 5/1/13. INTERVIEWS SCH FOR 3/14/13: 1. Removal or proper abandonment of existing gated 36 inch CMP outlet located at station 158+12 and associated dam foundation and embankment construction as needed. Request for Qualifications - CMAR Page 4 of 13 Contract FCD 2011C022 2. Construction of a new principal outlet system and associated embankment dam segment consisting of: • Construction of a temporary cofferdam • Removal of embankment dam section and 30-inch CMP Outlet and foundation excavation as needed • Construction of 48-inch outlet • Construction replacement of dam foundation and embankment segment including internal filter system. • Construction of a gated upstream intake structure and for the new outlet • Construction of stilling basin and junction box for the new outlet • Removal of temporary cofferdam 3. Relocation of existing segment of White Tanks FRS No. 4 Inlet Channel. 4. Extension of the left (east) abutment of the dam embankment to the north which will remove the existing left (east) emergency spillway from operation. 5. Construction of a new right (west) emergency spillway structure and required erosion protection. 6. Extension of the right (west) abutment of the dam embankment to the north. 7. Increase of the height of the existing dam embankment as needed for dam safety purposes. 8. Construction of two d

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT