Access the Full Project by Clicking here!
Bidjugde
JOB
Grevelia Street Street Improvement
BID DATE
09/5/17 - 11:00
AGENCY
South Pasadena
ESTIMATE
n/a
SCOPE
The project limits are on Grevelia Street, from Fair Oaks Avenue to Strafford Avenue. The project will slurry seal Clark Place, from Strafford Avenue to Station 45+50.00 as shown on the Plans. The work in general, to be performed pursuant to these specifications, consists of pavement rehabilitation and replacement of water services, meters, fire hydrants and other appurtenances. The project also includes repair of damaged PCC sidewalks and driveways at various locations. More specifically this project includes sawcut, removal and disposal of localized failed existing asphalt and PCC roadway sections, cold milling of existing pavement, subgrade preparation and compaction, A.C. overlay, full depth DGAC pavement, removal and reconstruction of damaged PCC pavement, curb and gutter, sidewalk, cross gutters, local depressions, driveway approaches, and ADA curb ramps; reconstruction of localized failed asphalt concrete pavement areas, utility adjustments, installation of new water meters, services

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT