South Street Sidewalk Gap Closure East Street
BID DATE
09/21/17 - 2:00
AGENCY
Anaheim
ESTIMATE
$398,000
SCOPE
The work to be done consists of removal of existing concrete and asphalt concrete paving,curb, curb and gutter, block wall, interfering portions of landscape and irrigation systems;the construction of asphalt concrete, curb, curb and gutter, sidewalk, drive approaches,access ramps, block wall,landscaping, catch basins and storm drain, utility improvements,signing and striping and site amenities; and all appurtenant work necessary for the properconstruction of the proposed improvements, in accordance with Plans and Specifications entitled South Street Sidewalk from 525 West of East Street to East Street. Jimson Gutierrez / (714) 765-5251 jgutierrez@anaheim.net