Access the Full Project by Clicking here!
Bidjugde
JOB
8th Avenue Improvements
BID DATE
01/29/13 - 2:00
AGENCY
City of Yuma
ESTIMATE
$1,256,000
SCOPE
This Project is located along 8th Avenue, from 24th Street to 32nd Street. Work includes the removal & replacement of approximately 24,242 square yards of asphaltic concrete pavement, keeping the aggregate base course and replacing/"sweetening" ABC only between Catalina Drive & West Palmcroft Drive. Work shall also include the removal & replacement of 10 fire hydrants, approx. 8,500 SF of concrete flatwork, and 1,319 linear feet of vertical curb & gutter. Underground utility work shall consist of the installation of approx. 5,240 LF of 12" C-900 CL-235 DR18 PVC water main, and approx. 113-10", 114-8", 591-6", and 184-4" LF of C-900 CL-235 DR18 PVC water main, including all associated appurtenances, along with the removal, replacement, & relocation of 36 potable water services. Sanitary Sewer improvements will consist of Pipe Crossing Replacements with C909 PVC Pipe, and 4 new sanitary manholes, as well as adjusting existing manhole rings. Existing Storm water Catch Basin Frames & Grates are to be replaced. Cibola Heights Stormwater Basin Improvement FY 2013 C.I.P. NO. 0012: This portion of the Project is located in the Retention Basin for the Cibola Heights Subdivisions between 20th Street & USBR Drain, West side of Avenue C. This project consists of removing three existing concrete Storm Drain Boxes and replacing them with three new Nyloplast Drain Basins and concrete slab cover, as well as extending existing storm pipes with new pipes.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT