JOB
Allen McColloch Pipeline OC 76 Turnout Relocation
BID DATE
09/12/17 - 2:00
AGENCY
Metropolitan WD
ESTIMATE
$800,000
SCOPE
The project consists of the installation of a new 24-inch pipeline, Metropolitan-furnished valves, reinforced concrete valve vault, and a blind flange; replacement of existing manhole; disconnection of existing 24-inch isolation valve; and other appurtenant work as specified and shown on the drawings Christine Chuang - (213) 217-6515 SpecsDesk@mwdh2o.com
PREBID
8/23/2017 2:00