Access the Full Project by Clicking here!
Bidjugde
JOB
Jibboom Street Bridge Rehabilitation
BID DATE
09/28/17 - 2:00
AGENCY
Sacramento County
ESTIMATE
$7,600,000
SCOPE
The work to be performed under this contract includes the furnishing of all labor, materials, and equipment for doing all of the work associated with removal and replacement of the existing corrugated metal bridge decking including removal of asphalt concrete surface and with painting of steel bridge. The Contractor will be required to establish and to maintain traffic handling (detour) during anticipated bridge construction closure. The installation of new corrugated metal decking requires the removal of existing corrugated metal bridge planks from the top of existing stringers (Steel ¿I¿-beams), removal of existing asphalt concrete surface, top of stringers surface preparation (grinding remnants of existing welds) for welding of new hot-dip galvanized metal bridge planks and installation of side dams by welding. Bridge painting includes surface preparation which will include full lead-base paint removal from all functional and non-functional structural steel to be painted, handling waste material (full containment of all wash water, debris and paint spray), cleaning and painting of all structural steel and hand and guard railing on the Jibboom Street Bridge over the American River. Stephen White (916) 874-5354 whitest@saccounty.net
PREBID
9/13/2017 1:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT