Access the Full Project by Clicking here!
Bidjugde
JOB
Palm Desert Water Reclamation Plant No 10 Plants B C
BID DATE
10/26/17 - 2:00
AGENCY
Coachella Valley Water District
ESTIMATE
$6,250,000
SCOPE
Prequalified bidders are: Cushman Contracting CorporationGSE Construction Co., Inc.J.R. Filanc Construction Company, Inc.Pacific Hydrotech CorporationSpiess Construction Co., Inc.W.M. Lyles CompanyC.W. Roen Construction CompanyGateway Pacific Contractors, Inc.J.F. Shea Construction, Inc.Pascal and Ludwig Rehabilitation of two (2) activated sludge treatment trains (Plants B and C) including structural modifications and removing and replacing influent and effluent channel aeration piping, slide gates, metering gates, telescoping valves, drain valves, process air header piping, froth spray system, rotary scum troughs. waste activated sludge pumps and variable frequency drives, return activated sludge pumps and variable frequency drives, return activated sludge flow meters, and scum pumps with local control panel. Also includes masonry wall repair and lining removal and replacement in Tertiary Filter T2. Donnell Wilcox - 760-398-2651 x2421 dwilcox@cvwd.org
UPDATES