Access the Full Project by Clicking here!
Bidjugde
JOB
Goleta Slough Dredging
BID DATE
09/12/17 - 2:00
AGENCY
Santa Barbara County
ESTIMATE
n/a
SCOPE
The Project generally consists of the removal of recently deposited material from Atascadero, San Jose, and San Pedro Creeks within, and adjacent to, the Goleta Slough, by hydraulic pipeline suction dredging. The approximate volume of material to be dredged is 68,700 cubic yards. The project requires that the dredged material be discharged into the surf zone at the westerly end of Goleta Beach Park.
PREBID
9/5/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT