Access the Full Project by Clicking here!
Bidjugde
JOB
Drinking Water System Improvements
BID DATE
09/15/17 - 12:00
AGENCY
Tombstone
ESTIMATE
$667,000
SCOPE
The work under the Water Infrastructure Improvements Project shall be for furnishing all labor, materials, transportation, and services for the construction and installation of the following: The Work (including base bid, and three (3) alternative items) is generally described as follows: (1) installation of water quality analysis equipment, electrical and controls, sampling locations, and new meters at treatment plant, (2) bypass piping, electrical and controls, installation of new reinforced polyethylene (RPE) lining at existing surface water reservoir, (3) magnetic flow meter, electrical and controls, and central SCADA system at Well No. 1, and (4) installation of new pre-packaged booster station with piping manifold and bladder tank, magnetic flow meter, and electrical and controls. Sealed Bids for the construction of the City of Tombstone Drinking Water System Improvements will be received by the City of Tombstone, addressed to: Elke Remeikis, and delivered to Tombstone Public Works Department at 613 Allen Street, PO Box 339, Tombstone, Arizona, 85638 by 12:00 pm local time on September 15, 2017, at which time the Bids received will be publicly opened and read. Copies of the Bidding Documents are available electronically (at no cost) for download by request in writing by emailing dmiller@westlandresources.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT