Access the Full Project by Clicking here!
Bidjugde
JOB
Sewer Rehabilitation Program
BID DATE
09/12/17 - 10:30
AGENCY
West Hollywood
ESTIMATE
$676,500
SCOPE
The work to be done consists of furnishing all materials, equipment, tools, labor, and incidentals for sanitary sewer repair and rehabilitation for a total of thirty-two (32) sanitary sewer pipeline segments throughout the City of West Hollywood at various locations as required by the Plans, Specifications, and contract documents. One (1) segment will point repairs of two (2) service lateral connections. Two (2) segments (30 LF) will require point repairs, by dig and replace method. Four (4) segments of 10-inch pipe will require CIPP rehabilitation (1,222 LF). The remaining twenty-eight (28) segments, consisting of 7,398 LF of 8-inch pipe will be lined with CIPP. All segments include reconnection and resealing of existing laterals to the rehabilitated sewer lines; implementation of an Emergency Sewage Spill Response Plan, Water Pollution Control Plan, Best Management Practices; and all appurtenant work as shown on the plans and delineated in these specifications. Segment data is listed on the plans. Donn Uyeno (323)848-6457 duyeno@weho.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT