Bayview Heights Drainage Runoff Treatment (REBID)
BID DATE
04/24/18 - 11:00
AGENCY
Newport Beach
ESTIMATE
$225,000
SCOPE
ORG BID RESULTS: Abny General Engineering - $319,932 Wright Construction Engineering Corp - $320,024 GCI Construction Inc - $395,317 Jeremy Harris Construction - $398,610 Aramexx Construction - $427,655 Access Pacific Inc - $483,822 Beador Construction Co. - $540,300 Work includes clearing and grubbing; securing a material layout area; controlling surface water; performing construction surveying; furnishing all submittals and construction items; providing traffic control submittals, water diversion plans, and dust control plans; controlling sediment and erosion; removing non-native vegetation; removing 15 large trees; filling the existing gully; grading the detention basin; installing 24-inch RCP, Nyloplast drain basin, 12-inch PVC pipe; constructing two concrete manholes, energy dissipator, outlet structure, and concrete flared end section; removing and placing rock riprap; cleaning out an existing 36-inch RCP; all other work as required to complete the project in place. Bob Stein - 949-644-3322 rstein@newportbeachca.gov
UPDATES