Access the Full Project by Clicking here!
Bidjugde
JOB
Almaden Valley Pipeline Inspection Rehabilitation
BID DATE
09/13/17 - 2:00
AGENCY
Santa Clara Valley WD
ESTIMATE
n/a
SCOPE
1. Completely drain and remove water from the Almaden Valley Pipeline and Santa Teresa Force Main. 2. Perform work in the raw water transmission pipeline and at ninety-three (93) appurtenance vault sites. See the Pipeline Maintenance Tables on Sheets G-04 through G-08 on the Drawings for descriptions of the appurtenance work to be completed at each site. 3. Provide logistical support for and participate in the manned internal visual and electromagnetic inspection of the Almaden Valley Pipeline and Santa Teresa Force Main by the District and its third-party consultant. 4. Provide logistical support for the installation of the Acoustic Fiber Optic (AFO) monitoring system for the Almaden Valley Pipeline and Santa Teresa Force Main by the District and its third-party consultant. 5. Clear and grub as needed for access to perform the Work. 6. Prepare and coat all in-vault and exposed pipeline appurtenances and associated piping assembly components. 7. Replace existing or install new ladders and hatches at appurtenance vaults. The contractor shall design, furnish, and install all fixed vault ladders. 8. Restore all impacted work sites to a condition equal to or better than existing prior to construction. scvwdplanroom@valleywater.org
PREBID
8/24/2017 8:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT