Access the Full Project by Clicking here!
Bidjugde
JOB
Renovation Bixby Ridge Community Trail
BID DATE
09/5/17 - 10:00
AGENCY
Signal Hill
ESTIMATE
$90,000
SCOPE
The Work to be accomplished under this Contract generally includes removal and offsite disposal of existing decomposed granite, aggregate, landscape plant material, soils, recycled plastic edging, timber stair treads and construction debris, installation of porous pavement, stabilized decomposed granite, recycled plastic edging, concrete mow curbs, timber stairs, catch basin, curb core, protection of existing sidewalks, concrete paving, street curbs, v-ditches, concrete stairs, private homeowner lots, documentation of the process using digital photography, traffic and parking control signage, and temporary chain link fencing with gates, signage and privacy windscreen to remain in place, as shown on the Plans and Specifications. acaraveo@cityofsignalhill.org
PREBID
8/29/2017 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT