Access the Full Project by Clicking here!
Bidjugde
JOB
Sidewalk Infill
BID DATE
08/22/17 - 2:00
AGENCY
Lompoc
ESTIMATE
$190,000
SCOPE
The work includes but is not necessarily limited to the following: Furnishing, hauling, placing, compacting, and grading of material; preparing subgrade for Portland cement concrete (PCC) and hot mix asphalt (HMA); furnishing and constructing ADA compliant PCC sidewalk, curb ramps, curb, curb & gutter, bulb-out, driveways, and appurtenant work to match existing; grinding PCC improvements; installing detectable warning surface tiles on PCC improvements; sawcutting; removals; installing new water meter boxes, appurtenances and extending service lines behind proposed sidewalk; installing new fire hydrant; tree removals; restriping traffic striping and markings; furnishing and installing a rapid flashing beacon crosswalk system; finish grading; clean-up and related work as required, to complete the work as specified by the Plans, these Special Provisions, the Standard Plans and Specifications and the City Standard Requirements. Steffen Meyer City of Lompoc Engineering / Public Works 100 Civic Center Lompoc, CA 93436 Tel:(805) 875-8240 Fax:(805) 875-8769 s_meyer@ci.lompoc.ca.us

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT