Access the Full Project by Clicking here!
Bidjugde
JOB
Casa Grande Landfill Drainage Improvements Phase I
BID DATE
08/22/17 - 1:30
AGENCY
Casa Grande
ESTIMATE
n/a
SCOPE
The City of Casa Grande is accepting proposals from qualified contractors for the construction of phase 1 of Casa Grande Landfill Drainage Improvements which involves construction of two 30 inch ductile iron pipe (30 DIP) and associated construction as shown on the plans. The objective of this project is to meet the onsite retention requirement of West cell of Landfill. The project involves Landfill West Cell stormwater collection and conveyance through 2-30 DIP pipes to the existing stormwater retention basin across an irrigation canal owned by the Bureau of Indian Affairs (BIA) and operated by the San Carlos Irrigation Project (SCIP). Abdul Rashid, PE, CFM Civil Engineer/Project Manager arashid@casagrandeaz.gov (520) 421-8625
PREBID
8/10/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT