Access the Full Project by Clicking here!
Bidjugde
JOB
Cable Road Culvert Damage
BID DATE
08/28/17 - 2:00
AGENCY
El Dorado County
ESTIMATE
$380,000
SCOPE
The Work to be performed includes drainage and roadway improvements to repair failed culverts and water inundation of the roadway that include: removal of existing 36 CMP culvert and replacement with a 11 x 4 reinforced concrete box culvert and headwalls; removal of a failed 12 RCP and placement of an 18 RCP; construction of reinforced concrete headwalls; roadway excavation, import borrow and class 2 AB to rebuild roadway section; erosion control including rolled erosion control product and rock slope protection. The roadway will be closed daily from 8:00 AM–5:00 PM and require construction area signs, changeable message signs and traffic control for the duration of this Project. contact: Brian Franklin e-mail: brian.franklin@edcgov.us
PREBID
8/17/2017 2:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT