Quail Valley Goetz Road Pedestrian Sidewalk Improvements
BID DATE
08/24/17 - 11:00
AGENCY
Menifee
ESTIMATE
$174,000
SCOPE
The work generally consists of but not limited to the following: 1. Remove existing AC Berm, Pavement, and Base; 2. Trim existing native trees and tree removals; 3. Remove existing wood rail fence; 4. Grading: Cut, Fill, and Export; 5. Construct Lane Extension; 6. Construct new Curb and Gutter; 7. Construct new Concrete Down Drain; 8. Construct new modified Curb Outlets; 9. Construct new Rip Rap Pad; 10. Construct new Construct new 4 wide Sidewalk; 11. Construct new ADA Pedestrian Ramps; 12. Construct 6 wide Rock Lined Swale; 13. Construct AC Overside Drain 14. Construct modified 6 thick Concrete Driveway