Access the Full Project by Clicking here!
Bidjugde
JOB
Faraday Storm Drain Improvements
BID DATE
08/10/17 - 2:00
AGENCY
Santa Barbara County
ESTIMATE
n/a
SCOPE
The Project generally consists of providing water pollution control; traffic control; installation of approximately 1,045 linear feet of 30-in diameter storm drain pipe by horizontally directionally drilling or shored trench (HDD – butt fused SDR11 IPS HDPE, shored trench – ADS Class 1 Polypropylene Type S); installation of approximately 1,515 linear feet of 24-in diameter storm drain pipe by horizontally directionally drilling or shored trench (HDD – butt fused SDR11 IPS HDPE, shored trench – ADS Class 1 Polypropylene Type S); installation of approximately 815 linear feet of 18-in storm drain by shored trench (Class III RCP OR ADS Class 1 Polypropylene Type S); installation of four (4) 48 precast manholes; installation of nine (9) 60 precast manholes; connection to the existing concrete box culvert; cast in place concrete Type C drop inlet; placement of backfill and hot mix asphalt; aggregate base surfacing, fog seal application, and protection and reconstruction of existing utilities.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT