Buckeye Erosion Repairs
BID DATE
08/16/17 - 3:00
AGENCY
AZDEMA
ESTIMATE
n/a
SCOPE
1.1 Several areas on this Buckeye AFRC have erosions from heavy rainfall that moves off the ORG and NON/ORG Parking surfaces. Two locations in the South NON/ORG parking that have concrete curbing and asphalt pavement will require spillways reflecting in the attached as-builds from a previous Florence Erosion Project. The width, length and direction of the spillways will depend on the existing open curbs being widened, fall or length of slopes and ending point at grade in retainage areas. Other areas will have 3-8 Rip-Rap Rock placed in or on, once the grade, slope or natural flow is re-established. This includes up to six (6) locations of the west and south chain link fencing that has or developed large gaps. 1.2 Four (4) Sloped areas ranging from 100-200 width and 20-30 length will have 1-3 landscaping rock similar to what is existing for future soil retention. kyle Matthew (kyle.matthew@fmo.azdema.gov )
UPDATES