Navajo Gallup Water Supply Project Reaches 27.7A 27.13
BID DATE
08/15/17 - 2:00
AGENCY
Gallup
ESTIMATE
n/a
SCOPE
Project consists of the following main items: Reach 27.7A: Located in Section 11, T15N, R17W, N.M.P.M. 3400 of 16 Ductile Iron Pipeline 3350 of 12 PVC Pipeline? Retirement of Existing Meter Vault and Construction of New Meter Vault (6 Size) Churchrock Meter Station (6 Size) 2.0 MG Welded Steel Reservoir Reservoir Site Grading, Inlet, Outlet and Drain Piping 16 H/W Bore & Crossing (237 LF, 26 Casing) 12 H/W Bore & Crossing (210 LF, 24 Casing) 12 Altitude Valve & Vault Upgrade Reach 27.13: Located in Sections 27 & 34, T15N, R18W, N.M.P.M. 8500 of 12 PVC Pipeline 1.5 MG Welded Steel Reservoir Reservoir Site Grading and Access Road, Inlet, Outlet and Drain Piping 970 of 2 Buried PVC Electrical Conduit 10-8 x 14-0 Tank Site Control Building Pump Station (2-20 HP and 1-40 HP Pumps) The project also includes installation of gate valves, construction of air release stations, manholes, trenching, backfilling, traffic control, and the removal and replacement of pavement and permitting. Frances Rodriguez (505) 863-1334 frodriguez@gallupnm.gov
PREBID
8/1/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT