Access the Full Project by Clicking here!
Bidjugde
JOB
Eastmark Phase VIII Roadway Improvements
BID DATE
08/10/17 - 1:00 LIVE!
AGENCY
Mesa
ESTIMATE
n/a
SCOPE
1. S. Copernicus (S867) – The Project consists of approximately 834 feet of two lane, full street surface improvements tying into existing improvements in S. Copernicus. Improvements include installation of sewer, potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, street sleeves, landscaping, and irrigation. 2. E. Point Twenty-Two Blvd Phase 1 (S868) – The Project consists of approximately 2,426 feet of half street improvements and landscaped median with one lane in each direction tying into existing four lane, full street improvements in E. Point Twenty-Two Blvd. Improvements include installation of sewer, potable water, storm drain, concrete arch culvert and pedestrian underpass, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, traffic signal conduit, street sleeves, entry monuments, landscaping, and irrigation. 3. S. Inspirian Parkway (S869) – The Project consists of approximately 1,835 feet of two lane, full street surface improvements tying into existing improvements in S. Inspirian Parkway. Improvements include installation of potable water, storm drain, dry utilities, concrete curb & gutter, sidewalk, paving, striping, signage, street lights, traffic signal conduit, street sleeves, entry monuments, landscaping, and irrigation. 4. Traffic Signal at Ray Road and Signal Butte Road (S870) – The Project consists of the installation of a four-way traffic signal located at the intersection of Ray Road and Signal Butte Road. For information contact: Melodie Jackson, City of Mesa, (480) 644-2526, melodie.jackson@mesaaz.gov.
PREBID
7/27/2017 3:30

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT