Access the Full Project by Clicking here!
Bidjugde
JOB
South Rollins Road Utility Improvements Phase 1
BID DATE
07/27/17 - 2:00
AGENCY
Burlingame
ESTIMATE
$2,790,000
SCOPE
This is the first phase of a three-phase project in subdivision along southern end of Rollins Road. The work shall consist of installing new water mains and new sanitary sewer mains in the City of Burlingame. Water main improvements consist of approximately 3,840 linear feet of new 8-inch, 443 linear feet of new 6-inch, and 103 linear feet of new 4-inch Polyvinyl Chloride (PVC) and Ductile Iron water main on South Rollins Road between Corbitt Drive and Humboldt Road. The existing 4-inch and 6-inch water mains will be abandoned in place. The construction method is anticipated to be conventional open trench and the water main will typically be installed at three to five feet depth of cover. The sanitary sewer work shall consist of approximately 660 linear feet of new 12-inch, 250 linear feet of new 10-inch, 100 linear feet of new 6-inch, and 390 linear feet of new 4-inch Polyvinyl Chloride (PVC SDR26) sewer mains along with 4 new manholes on South Rollins Road between the lift station at 399 Rollins Road and Humboldt Road. The existing 12-inch and 10-inch sewer mains will be removed to install the increased size mains. The construction method is anticipated to be conventional open trench and the sewer main will be installed at the current depth as the existing sewer system.
PREBID
7/18/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT