Access the Full Project by Clicking here!
Bidjugde
JOB
Yucaipa Blvd St Improvements
BID DATE
08/10/17 - 3:00
AGENCY
Yucaipa
ESTIMATE
$5,250,000
SCOPE
The work to be done shall consist of furnishing all the required labor, materials, equipment, parts, implements and supplies necessary for, or appurtenant to, the construction and completion of the project indicated above in accordance with Standard Drawings, Plans and the Specifications prepared for this project. In general terms, the contract work for this project shall consist of the following: Construction of new curb and gutter, new sidewalk, driveways, new asphalt concrete pavement, asphalt overlay, new ADA ramps, signing and striping, bike lanes, relocation or removal of existing facilities, abandonment of existing septic systems, maintaining interim septic and sewer service, construction of new Southern California Edison/Frontier Communications (Verizon) underground structures/conduit facilities, removals for the installation of new sewer and water facilities, traffic signal installation and modification, reconstruction of the existing asphalt street surface, storm drain facilities construction, retaining wall construction, fencing construction, site construction on private properties and staging of construction is required with this project to allow for coordination of utility relocations within the right of way in accordance with the Plans, Drawings, Specifications and other provisions of the Contract. Lorrie Hutchison City of Yucaipa Public Works 34272 Yucaipa Blvd Yucaipa, CA 92399 Tel:(909) 797-2489 Fax:(909) 500-7845 lhutchison@yucaipa.org
UPDATES