Access the Full Project by Clicking here!
Bidjugde
JOB
Storm Drain Pipe Replacement Railroad Avenue
BID DATE
07/20/17 - 2:00
AGENCY
Suisun City
ESTIMATE
$50,000
SCOPE
The work to be performed, in general, consists of supplying all labor, materials, tools, equipment, implements and methods of process to complete the following work: Removing 24 corrugated metal storm drain pipes, asphalt pavement, Class II AB, native soil and headwall; providing traffic control; installing reinforced concrete pipes, flared end section, headwall, rip rap and obstruction marker signs; paving which includes placing a structural section including Class II aggregate base and asphalt concrete; and replacing thermoplastic striping. publicworks@suisun.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT