Access the Full Project by Clicking here!
Bidjugde
JOB
Lee Ferry Access Rd at Marble Canyon, AZ
BID DATE
01/16/13 - 9:00
AGENCY
Department of Transportation
ESTIMATE
$7,500,000
SCOPE
This project is being advertised as a HUBZone Set-A-Side. It is estimated that this project will advertise in Early November, with bid opening in early December and a corresponding Notice to Proceed date in early January. The work will be located along Lee's Ferry Access Road beginning at the intersection with US-89A near Marble Canyon. The project is 5.74 miles in length beginning at the intersection of US-89A and terminating where Lee's Ferry Road ties into the Boat Ramp Parking lot at the Colorado River. The project consists of three (3) contract schedules and one (1) option which include grading, pulverizing existing pavement, paving, drainage, river bank protection, and erosion control construction activities. Schedule A (Approximately 3.97 miles in length) - Significant items include (approximate quantities subject to change): 7,450 CY of embankment construction; 1,240 CY of clearing and grubbing; 1,130 CY of gabions; 2,480 CY of revet mattress; 61,250 SY of Pulverizing (6 inch depth); 11,980 tons of roadway aggregate; 13,800 tons of Superpave asphalt pavement; 340 LF of 24 inch pipe culvert; 170 LF of 36 inch pipe culvert; 52 LF of 10 feet span, 5 feet rise reinforced concrete triple barrel box culvert; 162 LF of 72 inch pipe culvert lining; 2,090 LF of 14 inch depth concrete curb; 1,620 LF of 10 inch depth concrete curb and gutter; 4,660 LF of 12 inch deep concrete curb and gutter; 1,980 LF of 18 inch concrete curb and gutter; 3,910 SY of asphalt paved di

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT