Access the Full Project by Clicking here!
Bidjugde
JOB
(DESIGN BUILD) Apache Road Water Campus
BID DATE
10/17/17 - 8:00
AGENCY
Buckeye
ESTIMATE
$48,000,000
SCOPE
General Project Description a. Design a water campus that will serve the area shown in Exhibit 1. b. The Service Area is from Yuma Road on the north to Baseline Road and the railroad tracks on the south to Miller Road on the west and Watson Road on the east (see Exhibit 1). c. The new water campus site is approximately 10 acres and is located at the southeast corner of Apache Road and Alta Vista Road, see Exhibits 2. A. Service Area Water Master d. The service area includes two pressure zones - the zone split is at Broadway Road. Zone 1 is north of the zone split and zone 2 is south of the zone split, see Exhibit 1. e. The Master Plan Service Area is inside the area of the former Global water system service area. f. The design shall conform to all aspects shown in the City approved standard booster station. Plan and Design Report B. Site layout for a 16 MGD Water Treatment Facility. However, Phase I is anticipate to only include up to 8 MGD. C. Drill new wells D. Re-drill existing wells E. Reverse rotary well construction F. Offsite piping G. Onsite piping H. Above ground steel storage tanks I. Booster Pumps J. Hydro pneumatic tanks K. Arsenic treatment – PureFlo process L. Reverse Osmosis treatment M. Wastewater treatment loading, solids and effluent analysis N. APS power service O. Chlorination facilities P. SCADA dfasano@buckeyeaz.gov
UPDATES