Access the Full Project by Clicking here!
Bidjugde
JOB
Greenwood Dr Storm Damage Repairs
BID DATE
06/29/17 - 2:00
AGENCY
Paradise
ESTIMATE
$45,000
SCOPE
The work in general consists of reconstruction of a 25 wide, 180 long section of Greenwood Drive to a depth of 24 with various geotextile fabrics, Class II Aggregate Base, and Hot Mix Asphalt. Project also includes the grading of roadside ditches and installation of 15 HDPE culvert pipes.Marc A Mattox (530) 872-6291 ext 125 mmattox@townofparadise.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT