Citywide Pavement Rehabilitation Program
BID DATE
07/13/17 - 2:00
AGENCY
Oakland
ESTIMATE
$9,295,675
SCOPE
The proposed work consists, in general, of the construction of 132,274 SY of full-width milling; 42,718 tons of AC overlay; 5,271 tons of AC base repair; 59,541 LF of crack Seal, 29,230 SY of micro surfacing ; 47 concrete curb ramps (all types); the replacement of 20,706 SF concrete sidewalk; 266 of curb and gutter; 2,657 LF of curb and wide gutter; 686 LF of removal and repalcement of curb & gutter, 65,341 SY of offhaul and disposal of Pavement fabric,90,265 LF of various types of traffic striping; 16,261 SF of pavement markings; and other work specifically shown on the plans or included in the Special Provisions. A pre-project meeting is scheduled for Jun 27, 2017 - 10:00 am Mastewal Cherinet at 510-238-4981, mcherinet@oaklandnet.com