Access the Full Project by Clicking here!
Bidjugde
JOB
2016 WWTP Secondary Treatment Improvements
BID DATE
06/16/17 - 4:00
AGENCY
Auburn
ESTIMATE
$11,400,000
SCOPE
The City of Auburn (City) is proposing to construct a number of plant upgrades that will improve wastewater treatment plant (WWTP) performance, add process redundancy, and comply with new permit limitations. The WWTP has one oxidation ditch (a large aeration basin) that has never been taken out of service since its construction in the late 1970s. The project will construct a new oxidation ditch and associated facilities so that the existing oxidation ditch can be taken out of service for inspection and repairs. Several other new facilities are required to be constructed with the new oxidation ditch to make a complete secondary treatment process. These facilities include: (1) a new mechanical fine screens; (2) a new alkalinity feed system; (3) a new splitter box; (4) a new return sludge pump station; (5) a new electrical building ; (6) a generator set and medium voltage switchgear and (7) an allowance for installing a liner system in Pond No. 4. All facilities will be constructed within the existing plant site. The new ditch will be constructed within one of the existing treatment ponds.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT