Shields Ave East Bound Widening
BID DATE
07/18/17 - 3:00
AGENCY
Fresno
ESTIMATE
$500,000
SCOPE
The scope of work includes clearing and grubbing, roadway excavation and subgrade preparation, placement of base rock, asphalt concrete paving, median island curb and cap, concrete curb and gutter, ADA curb return and ramp, traffic signal modifications, roadway markings, signage and pavement striping, adjustment of water valves and sewer manholes to finish grades, and abandonment of irrigation water well. Mike Brown - 559-621-1165 Mike.Brown@Fresno.gov