Access the Full Project by Clicking here!
Bidjugde
JOB
Alamogordo Flood Control McKinley Channel Phase VIII
BID DATE
12/10/18 - 2:00
AGENCY
Department Army
ESTIMATE
n/a
SCOPE
THE PROJECT consists of approximately 2000 linear feet of reinforced concrete lined channel or concrete box culvert for the existing McKinley Channel. The first portion of project begins at the intersection of McKinley Channel and First Street and proceeds upstream for approximately 1000 feet. The final portion of the project begins at the intersection of McKinley Channel and Scenic Drive and proceed upstream approximately 1000 feet terminating with a proposed debris catch basin. Along the way, the channel configuration transitions between trapezoidal to rectangular sections. The channel includes splitter walls and access ramps. The purpose of the McKinley Channel is to route flood flows from McKinley Canyon through the developed areas of the City of Alamogordo to be delivered to drainage west of the city. This is an active channel within residential areas and associated confined work spaces. In addition, the contract includes the necessary utility relocations needed for the construction of the channel. Ms. Patricia Phillips at (505) 342-3416 or e-mail at: Patricia.L.Phillips@usace.army.mil
UPDATES