Access the Full Project by Clicking here!
Bidjugde
JOB
Highline Crafton Avenue Water Pipeline Replacement
BID DATE
06/27/17 - 2:00
AGENCY
Redlands
ESTIMATE
$1,500,000
SCOPE
The scope of work for this project is the installation of approximately 5,925 linear feet of 24 DIP/CML&C and 3,615 linear feet of 8 DIP water pipeline. The work shall consist of all traffic control (including furnishing and installing all arrowboards, barricades, signs, delineators, and flagmen); all utility location and verification (excavating, exposing, and verifying top, bottom, and side of utility facilities); all pavement removal and disposal; all earthwork; compacting; furnishing and installing all pipe, fittings, and appurtenances; protecting in place or removing and replacing all existing utilities, trees, and public and private improvements; replacing all asphalt concrete pavement including asphalt concrete overlays; pavement striping restriping; testing and disinfecting all pipelines; replacing destroyed survey monuments; disposing of excess soil and rock material and restoring all areas and improvements to pre-construction conditions. Goutam K. Dobey - 909-798-7584 x2 gdobey@cityofredlands.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT