West Side Tank Pump Station Phase I
BID DATE
07/3/17 - 3:00
AGENCY
Roseville
ESTIMATE
n/a
SCOPE
The West Side Tank and Pump Station Project will provide required storage capacity for the City of Rosevilles Pressure Zone 4 and future development in the West Plan with the addition of two (2) six million gallon storage tanks and an accompanying pump station. A previous geotechnical study revealed soils (fat clays) that are unsuitable for construction of the storage tanks and pump station facilities, which are predominant at the site. Removal of these soils is therefore required. Phase 1 of this project will include: Trenching to remove unsuitable soils from the site; Hauling off the material removed, to a site/location to be determined by the Contractor Ensuring interim and long-term positive site drainage Construction is anticipated to proceed in the summer of 2017. George Hanson (916) 746-1764 ghanson@roseville.ca.us