Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Street Rehabilitation Water Services Replacement
BID DATE
06/8/17 - 10:00
AGENCY
Sonoma
ESTIMATE
$552,000
SCOPE
In general, the work consists of street rehabilitation and improvements, including tree removal, edge-grinding existing asphalt pavement, repairing localized pavement failures, full width grinding and removal of existing asphalt pavement, crack sealing, placing asphalt pavement inlay, placement of geosynethic pavement interlayer, installation of pavement striping/markings and signing, adjusting utility structures to grade, upgrading existing curb ramps for ADA compliance, miscellaneous concrete sidewalk and curb and gutter construction, removing and replacing 1-inch residential water services and removing and replacing or installing new water main blowoffs, including trenching, shoring, installation, backfill and surface restoration, temporary traffic control, storm water pollution control and other related work, as set forth on the project Plans and Specifications.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT