Access the Full Project by Clicking here!
Bidjugde
JOB
Monrovia Renewal Northwest Area Infrastructure Improvements
BID DATE
06/28/17 - 2:00
AGENCY
Monrovia
ESTIMATE
$8,084,000
SCOPE
Demolition of: asphalt pavement, pulverization of pavement, saw cut concrete and asphalt, removal of: concrete curb and gutter, sidewalk, driveways, cross gutter, curb ramps, cold mill of AC pavement, rubberized AC Pavement, and AC pavement. Construction of: AC pavement, concrete: curb and gutter, sidewalk, drive approach, curb ramp, cross gutter, longitudinal gutter, transitional curb, and parkway drain, cape seal, slurry seal, adjust utilities, adjust manholes, traffic control, SWPPP, erosion control, and public notification. This project also includes: cutting and removing existing sewer pipelines, removing and replacing asphalt pavement, installation of 8 V.C.P. and 15 V.C.P. sewer piping, re-channeling existing man holes, and sewer bypass and Dewatering/pumping. The project includes: grinding asphalt paving, removing, and installation of 1, 1½, 2, Water Services, and abandoning existing water services. The project includes: pre and post CCTV, inspection of sewer pipe lines, removing and replacing sewer line sections and wyes, installation of Top Hats, lateral connections, lateral reinstatement, CIPP lining of sewer lines, CIPP point and/or sectional repair of sewer lines, reconnect of sewer service laterals internally, manhole base repair/replacement, installation of new water mains and removing water services and installing new water services.
PREBID
6/6/2017 10:00

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT