Wash Stabilization Improvements Bid Package 2
BID DATE
07/12/17 - 3:00
AGENCY
Lake Havasu
ESTIMATE
$3,019,000
SCOPE
SCHEDULE B ADDITIVE ENTERED. SCH A BASE IS AS FOLLOWS: CS LEGACY-$1,090,328 EAST VALLEY REVEG $1,043,844 BLUCOR- $993,390 FNF- $1,276,064 RUMMEL- $1,092,846 This project consists of the construction of concrete drop structures, grade control structures, bank protection using stacked gabions and concrete slope paving, bed protection using gabion mattresses to protect existing wash banks and beds from erosion during flood events. The construction is located at two wash locations within the City