Fulton Avenue Overlay Phase 2 Arden Way Auburn Blvd
BID DATE
06/29/17 - 2:00
AGENCY
Sacramento County
ESTIMATE
$3,950,000
SCOPE
roadway asphalt concrete overlay, construction of new curbs, gutters, sidewalks, driveways in infill areas and traffic signal modification at various locations as well as other incidental work. Roadway work will consist of placing rubberized asphalt concrete pavement overlay, slurry seal, repairing failed pavement (base repair), grinding the pavement to accommodate the overlay (cold planning), adjusting manholes to grade, placing thermoplastic striping, markings and markers, construction of ADA compliant pedestrian crossing including new curbs, gutters and sidewalks, construction of Type A driveways, median removal/reconstruction, street drainage modification, installation/relocation of street lights. Traffic signal modification will consist of replacing loop detectors signal detection system with Video/Radar Hybrid Signal Detection System at all intersections, relocation of selected Type 1B signal poles, installing mast arm signal poles and major traffic signal modification at intersection of Fulton Ave @ Edison Ave. Stephen White (916) 874-5354 whitest@saccounty.net

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT