Access the Full Project by Clicking here!
Bidjugde
JOB
NW Water Reclamation Facility Upgrades
BID DATE
11/29/12 - 1:30 LIVE!
AGENCY
City of Mesa
ESTIMATE
n/a
SCOPE
This contract shall be for furnishing all labor, materials, transportation and services for the construction and/or installation of the following work: Abandon and replace existing steel 24” aeration pipeline internal and external to Blower Building No 1. Reconstruct force main from the sanitary sewer and basin drain pump stations and replace existing pump motors and trim pump at the sanitary sewer pump station. Install new methanol piping and connect to existing methanol feed system located north of the head works building. Replace existing City water feed with an existing closed-loop cooling system for existing Turblex blowers. Automate existing stand-by generator and switchgear including complete replacement of the older (Westinghouse) switchgear section. Install new primary sludge degritting unit on existing support structure.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT