(DESIGN BUILD) Site 12 Treatment Expansion Site Work New Production Wells
BID DATE
11/14/17 - 10:00
AGENCY
Goodyear
ESTIMATE
$20,000,000
SCOPE
SUBMITTED: ARCHER WESTERN; HDR; GARNEY; JR FILANC; HUNTER; BROWN CALDWELL; CAROLLO Complete design services for the proposed improvements to include: a. Two new wells with an assumed depth of 500’BGS and a pumping rate of 1500GPM; b. RO treatment upgrades at Site 12 for additional capacity; c. RO treatment facility building at Site 12. New or pre-fabricated; d. Booster upgrades at Site 12 for additional capacity; e. New 2MG reservoir at Site 12, directly south and adjacent to existing reservoir; f. New and/or modifications to existing brine line and sewer connection; g. Misc. demolition; h. Earthwork and site grading; i. New site perimeter fencing; j. Water design report and other technical reports; k. Well development; l. May include drilling of well pilot holes; m. Other alternatives as may be developed during design; n. Modifications to SCADA control and associated electrical improvements. Procurement Officer: Victoria Jackson, CPPB Phone: (623) 882-7845 Email: Victoria.jackson@goodyearaz.gov
UPDATES