Access the Full Project by Clicking here!
Bidjugde
JOB
2015 16 Annual Street Overlay
BID DATE
06/15/17 - 2:00
AGENCY
Rialto
ESTIMATE
$3,000,000
SCOPE
The Work comprises the furnishing all materials, equipment, tools, labor and incidentals as required by the Plans, Specifications, and Contract Documents for the above stated project. The general items of work to be performed hereunder consist of traffic control; implementation and maintenance of Best Management Practices SWPPP; construction staking and monument perpetuation; removal and replacement of PCC curb ramps, curbs, gutters, cross-gutters, driveways, and sidewalk; construction of AC dikes and driveway; cold milling; crack sealing; full depth AC reconstruction; pavement pulverization and mixing with cement to create cement treated base; asphalt concrete base course; asphalt rubber hot mix (ARHM) surface course; and adjustment of surface utilities to grade. The work also includes construction of a reinforced concrete box culvert, installation of redwood headers; traffic striping and pavement markings, and replacement of affected traffic signal detector loops, and all associated work as identified on the construction drawings. Jeff Schafer/(909)820-2531 bidinfo@rialtoca.gov

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT