Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Street Resurfacing
BID DATE
06/14/17 - 2:00
AGENCY
Calabasas
ESTIMATE
n/a
SCOPE
The work includes: saw-cutting; excavation, removal and disposal of the AC roadway section; cold planing and disposal of AC pavement; replacement and compaction of subsurface material; setup and maintenance of temporary traffic control system; placement of crushed aggregate base and AC, and ARHM pavement materials; replacement of traffic striping and markings; and clean up of the project area. With the exception of Mulholland Hwy, the other three project areas borders residential homes; therefore, it is critical that noise and dust should be kept at a minimum during construction. Traffic control should be set up to allow for residents to access to their homes. bsalguero@cityofcalabasas.com

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT