Access the Full Project by Clicking here!
Bidjugde
JOB
2017 Asphalt Concrete Street Overlay Program
BID DATE
06/6/17 - 2:00
AGENCY
Newark
ESTIMATE
n/a
SCOPE
The scope of work includes traffic control, asphalt concrete roadway surface wedge/conform/full width grinding, localized full depth asphalt concrete patch paving of various depths, grading, placement of asphalt concrete, installation of speed bumps and signage, 12 inch RCP storm drain point repair, storm drain inlet concrete base repair, installation of temporary pavement delineation and raised pavement markers, adjusting existing utility covers to grade, application of thermoplastic traffic striping and pavement legends, and other related items of work as needed to complete improvements trang.tran@newark.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT