Access the Full Project by Clicking here!
Bidjugde
JOB
Concrete Maintenance
BID DATE
11/7/12 - 3:30 LIVE!
AGENCY
City of Goodyear
ESTIMATE
n/a
SCOPE
The work shall consist of removal and replacement of deteriorated or damaged concrete sidewalk, curb, and gutter, alleys entrances and/or as approved by the Project Manager. The Contractor shall set grades to match existing pavement, existing curb and gutter and sidewalk and existing drainage. The approximate quantities to be replaced are listed in the following base bids. For estimating purposes, a panel of sidewalk is 4-feet wide and 5-feet long although actual length may vary. Where the existing curb does not extend to the full 10-inch depth shown in preparation of the sub-grade shall be incidental to the appropriate bid item. The bid price for ramps from curb return to (PC) to curb return (PC). Intersection regarding shall be determined by the Project Manager upon completion of concrete work. The work limits will be confined to the outside returns of all corners at an intersection. Intersection regarding shall include all work in full for materials, labor, equipment, and incidentals necessary to complete the work.

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT