Pipeline 3 Relining Lake Murray Sweetwater Reservoir
BID DATE
06/14/17 - 2:00
AGENCY
San Diego County Water Authority
ESTIMATE
n/a
SCOPE
Relining approximately 23,000 feet of an existing 69-inch and 66-inch diameter prestressed concrete cylinder pipe; relining approximately 120 feet of previously relined 65-inch diameter prestressed concrete cylinder pipe; fabricating, setting, and welding 66-inch, 63-inch, and 62-inch outside diameter welded steel liner sections through seventeen access portals; grouting annular space behind installed liner sections; field applying cement mortar lining interior of installed steel pipe; installing seventeen portals to access the existing 69-inch and 66-inch pipe. See Contract Documents for detail.