Access the Full Project by Clicking here!
Bidjugde
JOB
Hamilton Levee Seepage Collection Phase II
BID DATE
05/30/17 - 2:00
AGENCY
Novato
ESTIMATE
$410,000
SCOPE
Installation of a seepage collection toe drain along portions of the Hamilton Field Levee. The work includes partial demolition and subsequent reconstruction of concrete v-ditches, excavation and off- haul of excess excavated material; furnishing and installing perforated pipe, geotextile fabric and permeable material; and site restoration. The work also includes temporary traffic control (pedestrian, bicycle and vehicular); trench dewatering; vegetation trimming; water pollution control; protection of existing public and private improvements; off-haul and disposal of excavated material, final site stabilization; and other items or details not mentioned above that are required by the plans, standard specifications, or these project specifications to be performed, placed, constructed, or installed. Edith Robbins City of Novato 901 Sherman Ave Novato, CA 94945 Tel:(415) 899-8953 Fax:(415) 899-8251 erobbins@novato.org

TRACKING
DOCUMENTS
PHOLDERS
LOCATION
ABSTRACT